Hard wired Group Living Call System Upgrade - Phase 1
What the buyer wrote
The London Borough of Hillingdon (LBH) intends to replace and upgrade the existing Warden Call Systems within the following 8 Sheltered Housing Schemes: 1. 1-32 Ascott Court, Farmlands Eastcote Middx HA5 2LJ 2. 1-30 Barden Court, Hall Drive, Harefield, Middx UB9 6LA 3. 1-26 Childs Court, Hemmen Lane Hayes Middx UB3 2JY 4. 1-37 Darrell Charles Court, Uxbridge Middx UB8 1JQ 5. 1-25 Drayton Court, The Glebe, West Drayton, Middx UB7 9JG 6. 1-46 James Court, Hallowell Road Northwood Middx HA6 1DR 7. 1-29 Sibley Court, Hillingdon, Uxbridge, Middx UB3 3DY 8. 1-6/21-45 St Catherines Farm Court, Ruislip Middx HA4 7YH The works include, but not limited to the design, supply, installation…
Details
- What the buyer calls it
- Hard wired Group Living Call System Upgrade - Phase 1
- How they are buying
- Advertised, open to anyoneAny supplier could bid without being invited first.
- Type
- works
- Suitable for small firms
- The buyer says yes. What that is worth
- Work starts
- 4 Nov 2019
- Work ends
- 13 Jan 2020
Who the buyer named
Wayne Toovey was the named contact on this notice.
