Skip to the main content
The Crier

Hazlemere Youth Centre - Legionella Remedial Works

Your saved contracts

What the buyer wrote

To isolate and drain down 2 No. 500 gallon cold water storage tanks. Link up mains water pipework to cold water downs pipework via a pressure reducing valve set at 1.5 bar. To change ballvalve jets from high pressure to low pressure jets on all toilets. Supply and install 2 No. mixing valves and set at 41°c. To check operation of all other mixing valves and set temperatures to 41°c as required. To strip out 5 No. dead legs and straight line pipework. To strip out braided hoses and replace with copper pipework. Strip out 1 No. 180 litre hot water cylinder and supply and install new isolation valves. Supply and fit 1 No. 210 litre Prostel unvented cylinder and run all discharges safely…

Read all of it on Contracts Finder →

Bid for this and lost? There is a short window in which the decision can be questioned.

Awarded to

Industrial Pipe Services (2003) Limited£10kends (26 Nov 2018)

Details

What the buyer calls it
Hazlemere Youth Centre - Legionella Remedial Works
How they are buying
Advertised, shortlist firstSuppliers applied to be considered, and the buyer picked who went on to bid.
Type
works
Suitable for small firms
The buyer says yes. What that is worth
Work starts
14 Oct 2018
Work ends
26 Nov 2018

Who the buyer named

Jenny O'Neill was the named contact on this notice.

jeoneill@buckscc.gov.uk