Skip to the main content
The Crier

Heat Network Integrated Studies - ESPO Renewable Energy Solutions Framework (2838) Lot 2 Direct Award

Your saved contracts

What the buyer wrote

BCC are installing heat networks across the city in order to support the Mayor's commitment for Bristol to be a carbon neutral city by 2050 and to reduce fuel poverty. To date BCC social housing blocks have been connected to the network and the Energy service has planned for the expansion of the network to extend to non BCC buildings such as offices, residential units, student housing and hotels. Studies will deliver the following: 1. Assessment of integration of city-wide networks. Feasibility study into the integration of the city's network clusters to include consideration of all previous work to assess the potential for installing a city ring main, the connecting pipe routes, key crossin…

Read all of it on Contracts Finder →

Bid for this and lost? There is a short window in which the decision can be questioned.

Awarded to

Sustainable Energy Limited£220kends (8 Aug 2020)

Details

What the buyer calls it
Heat Network Integrated Studies - ESPO Renewable Energy Solutions Framework (2838) Lot 2 Direct Award
How they are buying
Given to one supplier, no competitionNobody else was asked, and the buyer has to be able to justify that.
Type
services
Suitable for small firms
The buyer says yes. What that is worth
Work starts
31 Aug 2019
Work ends
8 Aug 2020

Who the buyer named

William Smalley was the named contact on this notice.

william.smalley@bristol.gov.uk