High Wycombe Town Centre Masterplan (HWTCMP) - Alternative Route Phase 4 - Enabling Works - GPR Survey
Buckinghamshire County Councilservices
What the buyer wrote
Undertake a comprehensive utilities services survey using both electromagnetic and ground penetrating radar techniques of the area highlighted on drawing C9069/DRF/17/7000/1002 - Including a drainage connectivity survey showing line, invert levels and direction of flow with connectivity. (This is not a CCTV survey). Provide an AutoCAD 2D & 3D DWG basic topographical mapping survey, overlay accurate utility information including depths of each service.
Bid for this and lost? There is a short window in which the decision can be questioned.
Awarded to
Details
- What the buyer calls it
- High Wycombe Town Centre Masterplan (HWTCMP) - Alternative Route Phase 4 - Enabling Works - GPR Survey
- How they are buying
- Given to one supplier, no competitionNobody else was asked, and the buyer has to be able to justify that.
- Type
- services
- Suitable for small firms
- The buyer says yes. What that is worth
- Work starts
- 27 Aug 2017
- Work ends
- 5 Sep 2017
Who the buyer named
Eddie Davies was the named contact on this notice.
