The principle purpose of the works is to take down the existing dry stone masonry retaining wall and replace it with a gabion retaining wall faced with masonry as per the design. Reconstruction of the masonry parapet to the specified height (1000mm above finished footway), using the existing and imported material. The employer?s requirements are described in detail in the Specification and the drawings listed in Appendix 0/4 to the Specification. The Contractor shall prepare and complete the specification appendices depending on his tender or detailed design in accordance with the instructions in Appendix 0/3. Additional information: Tenders must be received via the Chest portal to ar…

Read all of it on Contracts Finder →

Details

What the buyer calls it
Higher Calderbrook Road Retaining Wall no.2 Reconstruction
How they are buying
The buyer did not say
Type
works
Work starts
22 Feb 2016
Work ends
12 Jun 2016