Higher Calderbrook Road Retaining Wall no.2 Reconstruction
What the buyer wrote
The principle purpose of the works is to take down the existing dry stone masonry retaining wall and replace it with a gabion retaining wall faced with masonry as per the design. Reconstruction of the masonry parapet to the specified height (1000mm above finished footway), using the existing and imported material. The employer?s requirements are described in detail in the Specification and the drawings listed in Appendix 0/4 to the Specification. The Contractor shall prepare and complete the specification appendices depending on his tender or detailed design in accordance with the instructions in Appendix 0/3. Additional information: Tenders must be received via the Chest portal to ar…
Details
- What the buyer calls it
- Higher Calderbrook Road Retaining Wall no.2 Reconstruction
- How they are buying
- The buyer did not say
- Type
- works
- Work starts
- 22 Feb 2016
- Work ends
- 12 Jun 2016
- Kind of work
- Construction
Who the buyer named
The buyer published a contact address on this notice.