What the buyer wrote
Highways Verge Works North of A171 Creation of Bridleway Crossing with Holding Area as detailed in DMRB Vol. 6, S3, part 5, sect. 9 Lined with geotextile and surfaced with 150mm compacted type 1 aggregate and finished with a compacted 25mm layer of 6mm- dust. Install drainage provision to prevent surface water discharging onto the highway Extension of tarmac area and extension of dropped kerb from field access to crossing area (approx. 4m x 1m) Crossing to be constructed in accordance with Standard Detail B4 and E6W Existing highway drainage grip relocated downhill of the proposed crossing Surface levelling along bridleway route, relocation of stone mound South of A171 Creation of …
Details
- What the buyer calls it
- Highways Works on A171
- How they are buying
- Advertised, open to anyoneAny supplier could bid without being invited first.
- Type
- works
- Suitable for small firms
- The buyer says yes. What that is worth
- Work starts
- 10 Jun 2018
- Work ends
- 22 Jun 2018
Who the buyer named
Michael Graham was the named contact on this notice.
