Hill Head Coastal Protection Project: Geotechnical Investigation, Structural Investigation of Existing Coastal Defence Assets and Reporting
What the buyer wrote
The Employer is: Fareham Borough Council, Civic Offices, Civic Way, Hampshire, PO16 7AZ The works are: Geotechnical investigation and structural investigation of existing defence structures to inform detailed design of Hill Head seawall replacement. Works include: fieldwork; laboratory testing; and factual reporting. The site is: Seaward and landward of current coastal defences at Hill Head between the Hill Head Sailing Club Car Park and the Concrete wave re-curve wall South East of the car park. The completion date for each section of the works are: Condition to be met Key date 1. Earliest date on site 26/09/2016 2. Completion of investigations 07/10/2016 3. Comp…
Details
- What the buyer calls it
- Hill Head Coastal Protection Project: Geotechnical Investigation, Structural Investigation of Existing Coastal Defence Assets and Reporting
- How they are buying
- Advertised, open to anyoneAny supplier could bid without being invited first.
- Type
- works
- Suitable for small firms
- The buyer says yes. What that is worth
- Work starts
- 25 Sep 2016
- Work ends
- 28 Oct 2016
Who the buyer named
Nicky Roberts was the named contact on this notice.
