What the buyer wrote
Carry out the isolation and disconnection of hot and cold water services to 9no. water sink/trough. (Due to there being no access to the existing sensor taps under the pre-built water sink/trough we will Have to disconnect and remove the trough to allow the removal of the new taps.) Carry out the installation of 23 no. Non concussive Taps Re install Sink/trough after new taps are installed, Re seal sink/trough with silicon Carry out the alterations to the pipework and carry out installation of new blended water float to each tap. Remove cabling and dart valley sensor equipment from under each sink/trough Check and test
Bid for this and lost? There is a short window in which the decision can be questioned.
Awarded to
Details
- What the buyer calls it
- Holmer Green First School - Legionella Remedials
- How they are buying
- Advertised, shortlist firstSuppliers applied to be considered, and the buyer picked who went on to bid.
- Type
- works
- Suitable for small firms
- The buyer says yes. What that is worth
- Work starts
- 14 Apr 2020
- Work ends
- 30 Apr 2020
- Kind of work
- Heating, plumbing and mechanical
Who the buyer named
The buyer published a contact address on this notice.
