What the buyer wrote
The multi storey building, Vallum Court, Westgate Road, Newcastle upon Tyne NE4 6NQ was constructed in 1965 and has 120 dwellings spread over 20 floors. The original 6 soil stacks have been identified as being in a state of disrepair and require replacing with an upgraded HDPE system. The works will include breaking in to existing ducts via the individual flats and isolate all connected waste pipes. Remove the existing soil stacks in sections from each flat and replace with HDPE Terrain Fuze system or similar. All floor levels that the stacks run through must be sealed using the appropriate fire collars as per Building Regulations 2010 Part B. Individual compression tests are required at…
Bid for this and lost? There is a short window in which the decision can be questioned.
Awarded to
Details
- What the buyer calls it
- HRA - P1446 - Vallum House Soil Stack Replacement
- How they are buying
- Advertised, open to anyoneAny supplier could bid without being invited first.
- Type
- works
- Work starts
- 21 Aug 2016
- Work ends
- 1 Apr 2017
- Kind of work
- Construction
Who the buyer named
Becky Polito was the named contact on this notice.
