What the buyer wrote
This is the first stage of a two stage tender process. The Science Museum have identified the need to replace key components of their main electrical infrastructure supplying their South Kensington premises. The building is supplied at Medium Voltage (MV) through a 6.6kV private network originating from two feeders originating at the neighbouring Natural History Museum site. The MV distribution supports five load centres distributed around the basement of the Science Museum. The load centres are denoted as substations H, J, K, L & M. Load centre H, J, K & M each include: - 2 No 800kVA transformers, each with close-coupled ring main units. - 2 No LV switchpanels, each fed from a dedica…
Details
- What the buyer calls it
- HVLV Replacement Project
- How they are buying
- Advertised, shortlist firstSuppliers applied to be considered, and the buyer picked who went on to bid.
- Type
- works
- Work starts
- 1 Dec 2020
- Work ends
- 1 Jun 2021
Who the buyer named
Anne Prugnon was the named contact on this notice.
