HW05661 - Upper Don Flood Alleviation Scheme (Fas) - Phase 1 Loxley Confluence
What the buyer wrote
The project is the design and construction of linear flood defences along both banks of the river Loxley from Malin bridge to the confluence of the rivers Loxley and Don. The site is generally split into three locations: Holme Lane Defences, Penistone Road Defences and Loxley Confluence Defences. The defences will consist of a combination of new structures and modifications to existing structures and buildings and may include the following: retaining walls, retaining walls with mini-piles, gravity walls, raising and/or strengthening existing walls, ground raising and embankments, bridge parapets, flap valves and flood gates.
Bid for this and lost? There is a short window in which the decision can be questioned.
Awarded to
Details
- What the buyer calls it
- HW05661 - Upper Don Flood Alleviation Scheme (Fas) - Phase 1 Loxley Confluence
- How they are buying
- Advertised, open to anyoneAny supplier could bid without being invited first.
- Type
- works
- Work starts
- 31 Mar 2020
- Work ends
- 29 Oct 2021
- Kind of work
- New build construction, Civil engineering and groundworks