Skip to the main content
The Crier

HW05661 - Upper Don Flood Alleviation Scheme (Fas) - Phase 1 Loxley Confluence

Your saved contracts

What the buyer wrote

The project is the design and construction of linear flood defences along both banks of the river Loxley from Malin bridge to the confluence of the rivers Loxley and Don. The site is generally split into three locations: Holme Lane Defences, Penistone Road Defences and Loxley Confluence Defences. The defences will consist of a combination of new structures and modifications to existing structures and buildings and may include the following: retaining walls, retaining walls with mini-piles, gravity walls, raising and/or strengthening existing walls, ground raising and embankments, bridge parapets, flap valves and flood gates.

Bid for this and lost? There is a short window in which the decision can be questioned.

Awarded to

North Midland Construction PLC£7.7mends (29 Oct 2021)

Details

What the buyer calls it
HW05661 - Upper Don Flood Alleviation Scheme (Fas) - Phase 1 Loxley Confluence
How they are buying
Advertised, open to anyoneAny supplier could bid without being invited first.
Type
works
Work starts
31 Mar 2020
Work ends
29 Oct 2021

Who the buyer named

The buyer published a contact address on this notice.

commercialservices@sheffield.gov.uk