What the buyer wrote
The works comprise the replacement and upgrade of the existing gas burner systems serving three boilers within the IMO Building. The Contractor shall undertake the works sequentially, maintaining heating resilience by ensuring a minimum of two boilers remain operational at all times. The items of works are summarised as follows: • Removal and disposal of existing Ecoflam burners and associated redundant equipment. • Supply and installation of new low-NOx gas burners, burner plates and associated components to all three boilers. • Replacement of boiler door refractory and installation of new boiler water temperature sensors. • Modifications to existing gas pipework, gas trains, electrical su…
Bid for this and lost? There is a short window in which the decision can be questioned.
Awarded to
Details
- What the buyer calls it
- IMO Boiler Burner Replacements
- How they are buying
- Advertised, open to anyoneAny supplier could bid without being invited first.
- Work starts
- 2 Nov 2026
- Work ends
- 30 Nov 2026
- Where
- in London
- Kind of work
- Heating, plumbing and mechanical
Who the buyer named
Liz Davies was the named contact on this notice.
