Installation and repairs to culverts at Chippenham Fen NNR
What the buyer wrote
NE appointment under Construction (Design and Management) Regulations 2015 the role of Principle Contractor and Designer to Supplier to cover: 1) Shall build up soil over two existing culverts to raise the level at position 1 & 4. At position 1 to bring in stone to provide additional cover, approximately 300mm over the culvert using granite -20mm to dust type one (circa 20 ton) will be used. Compact and grade the surface. At position 4 on map -To make up ground on the cross over point of the two ditches and reed beds using site won material from reed bed, loaded into a tracked dumper and taken to the tip area for spreading and compacting using the excavator. Approximately 300mm - 500mm…
Bid for this and lost? There is a short window in which the decision can be questioned.
Awarded to
Details
- What the buyer calls it
- Installation and repairs to culverts at Chippenham Fen NNR
- How they are buying
- Advertised, open to anyoneAny supplier could bid without being invited first.
- Type
- works
- Suitable for small firms
- The buyer says yes. What that is worth
- Work starts
- 9 Sep 2018
- Work ends
- 31 Oct 2018