Installation of a New Combined Heating Power (CHP) System with Mini District Heating at the Beecroft Gallery and Central Museum, Southend on Sea
What the buyer wrote
Southend Borough Council requires a contractor to design, equip and install a 500kW Combined CHP System incorporating a mini district heating network. This is to be a showcase project delivering green heat into two of Southend’s iconic buildings. The works will include: 1. A single CHP system to be located within the existing plant room located on the roof of the gallery. 2. Approximately 150 meters of pre-insulated twin piping run in a trench to supply the Central museum. 3. Equipping the system with all required heat exchangers, control valves, heat meters, pumps, remote meter reading etc. 4. Full visualisation package for public awareness fed into remote display screens and web s…
Details
- What the buyer calls it
- Installation of a New Combined Heating Power (CHP) System with Mini District Heating at the Beecroft Gallery and Central Museum, Southend on Sea
- How they are buying
- Advertised, open to anyoneAny supplier could bid without being invited first.
- Type
- works
- Suitable for small firms
- The buyer says yes. What that is worth
- Work starts
- 1 Feb 2016
- Work ends
- 30 Mar 2016
Who the buyer named
Emma Woof was the named contact on this notice.
