Skip to the main content
The Crier

Installation of an LED Communal Lighting System at Barden Court & Ascott Court

Your saved contracts

What the buyer wrote

The London Borough of Hillingdon intends to replace the existing Communal Lighting system at Barden Court, Hall Drive, Harefield, Middx, UB9 6LA and Ascott Court, Farmlands, Eastcote, Middx, HA5 2LJ Sheltered Housing Schemes. The blocks comprise of 30 dwellings at Barden Court spread across two floors and 32 dwellings spread across two floors at Ascott Court. The lighting systems manufacture Commulite Ltd or equally approved. The new Communal Lighting System works will broadly comprise of the installation of 307 LED (Light Emitting Diode) luminaries supplied from 8 Control Panels with 8 local test positions. The following drawings in Appendix 1 show the proposed locations of the control …

Read all of it on Contracts Finder →

Details

What the buyer calls it
Installation of an LED Communal Lighting System at Barden Court & Ascott Court
How they are buying
Advertised, open to anyoneAny supplier could bid without being invited first.
Type
works
Suitable for small firms
The buyer says yes. What that is worth
Work starts
31 Jul 2018
Work ends
11 Sep 2018

Who the buyer named

Mark Holmes was the named contact on this notice.

mholmes2@hillingdon.gov.uk