Skip to the main content
The Crier

Internal Alterations at Bilston Fire Station

Your saved contracts

What the buyer wrote

The works will generally consist of the following: stripping out of the existing boiler room, kit drying room and B.A. services room and making good. Structural repairs and support to form two new store rooms and cycle store room. Construction of a new gymnasium and new boiler room to encapsulate the repositioned heating boiler within the existing appliance bay. Form a new kit drying room and B.A. services room within the existing locker room area, including new foul water drainage connections. The formulation of new shower rooms at first floor level within the former first floor gymnasium, including new foul water drainage connections. The location of the works is as follows: Bilsto…

Read all of it on Contracts Finder →

Bid for this and lost? There is a short window in which the decision can be questioned.

Awarded to

Three Pines Building Co. Limited£59.3kends (31 Aug 2016)

Details

What the buyer calls it
Internal Alterations at Bilston Fire Station
How they are buying
The buyer did not say
Suitable for small firms
The buyer says yes. What that is worth
Work starts
12 Jun 2016
Work ends
31 Aug 2016

Who the buyer named

The buyer published a contact address on this notice.

tina.daniels@wmfs.net