What the buyer wrote
This package consists of Minor Bridge Works - Saddles (7 in total) and are located throughout Cumbria The work Package was procured via a two stage design and build approach with the successful tenderer for stage 1 assuming the role of both principal designer and principle contractor to undertake the investigation and design element of the works.
Bid for this and lost? There is a short window in which the decision can be questioned.
Awarded to
Details
- What the buyer calls it
- IRP Bridges - Work Package WP17/SA1
- How they are buying
- The buyer did not say
- Type
- works
- Suitable for small firms
- The buyer says yes. What that is worth
- Work starts
- 31 Oct 2017
- Work ends
- 31 Oct 2018
Who the buyer named
Alan Young was the named contact on this notice.
