What the buyer wrote
The existing earth bund located between Islip weir structure and Mill Street, Islip (SP5231313783) is approximately 60m in length. The bund has suffered damage due to overtopping during significant flood events over many years. The main area of damage is focused at the midpoint of the bund alignment. The aim of this project is to restore the crest level of the bund ensuring a consistent level over the entire length is achieved. A design is required and will be accepted by the client for reinforcing the crest footpath with the aim of reducing the rate of erosion to the crest caused by overtopping and pedestrian traffic. Significant H&S risk has been identified relating to the mains power fe…
Bid for this and lost? There is a short window in which the decision can be questioned.
Awarded to
Details
- What the buyer calls it
- Islip Bund Recovery Work
- How they are buying
- Called off an existing agreementThe work went to a supplier already on a framework or dynamic market.
- Type
- works
- Suitable for small firms
- The buyer says yes. What that is worth
- Work starts
- 1 Nov 2020
- Work ends
- 31 Mar 2021