ISO11 Fumigation Lobby and Dedicated Air Handling Unit (AHU) - Retender
What the buyer wrote
Description This opportunity (“Contract”) is for a single supplier to provide: 1. Design, Build, Installation and Operational Qualification of a new Fumigation Lobby and dedicated AHU for the ISO11 SAPO 4 Animal Facility. 2. Detailed Design including attendance to HAZOP study and allowance for updating Detailed Design in line with HAZOP Recommendations. 3. Build of the new Fumigation Lobby and Dedicated AHU at the supplier’s factory which includes Factory Acceptance Test (FAT). 4. Delivery of new Fumigation Lobby and Dedicated AHU to The Pirbright Institute. 5. Installation of new Fumigation Lobby and Dedicated AHU into refurbish area of ISO11. (Please note that the area where the new equipm…
Details
- What the buyer calls it
- ISO11 Fumigation Lobby and Dedicated Air Handling Unit (AHU) - Retender
- How they are buying
- Advertised, open to anyoneAny supplier could bid without being invited first.
- Type
- works
- Where
- in the South East
Asking a question
Holly Collen is the named contact on this notice. Questions close 20 Oct 2026, 16:00 BST.
You submit through the buyer’s own system: In-tend.
