IT Cabling Framework - Shipley Town Hall
What the buyer wrote
Shipley Town Hall1.3.1. A Fibre link is required to Cabinet-C and Cabinet-D on the 2nd floor, from the main Cabinet-A in the Basement. Please price for the following options: • Single mode - Fibre 4-Core OM1 ST • Multi-mode - Fibre 4-Core OM1 ST • Relocation of the whole fibre panel including all fibre links from Cabinet-X to Cabinet-A within Comms room on Basement floor. 1.3.2. 16 new double and 5 new quad network points (Cat-5E data sockets) required in various locations in the Basement. (Locations on attached map - Appendix 1 Shipley Basement Floor) 1.3.3. 3 new double network points (Cat-5E data sockets) required in various locations on the ground floor. (Locations on attache…
Bid for this and lost? There is a short window in which the decision can be questioned.
Awarded to
Details
- What the buyer calls it
- IT Cabling Framework - Shipley Town Hall
- How they are buying
- Advertised, open to anyoneAny supplier could bid without being invited first.
- Type
- services
- Work starts
- 30 Sep 2018
- Work ends
- 31 Dec 2018
- Kind of work
- Electrical installation
Who the buyer named
Zoe Nichols was the named contact on this notice.
