What the buyer wrote
The Kearsley Brook flood risk modelling study (JBA, 2015) has been used in conjunction with other available data to assess the flood history at the property. The modelling study found that the main source of flooding during the 2007 event was overtopping of the Kearsley Brook. This occurred because of the limited capacity of Kearsley Brook, exacerbated by an accumulation of debris on structures within the channel. Doncaster MBC seeks a passive property level protection solution to prevent entry of water into the outlined properties.
Details
- What the buyer calls it
- Kearsley Brook PLR Scheme
- How they are buying
- Advertised, open to anyoneAny supplier could bid without being invited first.
- Type
- services
- Suitable for small firms
- The buyer says yes. What that is worth
- Work starts
- 31 Aug 2018
- Work ends
- 31 Oct 2018
- Kind of work
- Structural and civil engineering consultancy
Who the buyer named
Angela Harrington was the named contact on this notice.