What the buyer wrote
This contract is for the redevelopment of Kingston Cromwell Road Bus Station, which includes demolishing the original structure, replacing the existing building and canopy, installation of mechanical and electrical systems, resurfacing, drainage and lighting. The design is at RIBA Stage 4 for architectural and structural elements and RIBA Stage 3 for civils and highways. The successful contractor will be required to complete certain elements of design, in particular a mechanical and electrical (M&E) package for a lift. The estimated total value range is 4 000 000 to 6 000 000 GBP. Transport for London (TfL) requires a contractor to construct the new bus station as per the planning consen…
Details
- What the buyer calls it
- Kingston Cromwell Road Bus Station Replacement
- How they are buying
- Advertised, shortlist firstSuppliers applied to be considered, and the buyer picked who went on to bid.
- Type
- works
- Suitable for small firms
- The buyer says yes. What that is worth
- Work starts
- 9 Jun 2020
- Work ends
- 4 Jan 2022
Who the buyer named
The buyer published a contact address on this notice.
