Kingston Station Replacement Cycle/Foot Bridge
What the buyer wrote
The proposed works comprise demolition of existing reinforced concrete bankseats of footbridge (existing footbridge has been removed previously), construction of reinforced concrete bankseats for replacement cycle bridge and fabrication and installation of a steel truss cycle bridge. The proposed footbridge is to be adjacent to Kingston Railway Bridge and is to bear on to the existing Network Rail abutments that are used by Kingston Railway Bridge. The existing footbridge currently bears on to the existing Network Rail abutments. It has been shown through a load assessment that the proposed bridge is to impose a lower load on the existing Network Rail abutments, for the following load cases…
Details
- What the buyer calls it
- Kingston Station Replacement Cycle/Foot Bridge
- How they are buying
- Advertised, open to anyoneAny supplier could bid without being invited first.
- Type
- works
- Work starts
- 30 Jun 2018
- Work ends
- 31 Jan 2019
Who the buyer named
The buyer published a contact address on this notice.
