Skip to the main content
The Crier

Kingston Station Replacement Cycle/Foot Bridge

Your saved contracts

What the buyer wrote

The proposed works comprise demolition of existing reinforced concrete bankseats of footbridge (existing footbridge has been removed previously), construction of reinforced concrete bankseats for replacement cycle bridge and fabrication and installation of a steel truss cycle bridge. The proposed footbridge is to be adjacent to Kingston Railway Bridge and is to bear on to the existing Network Rail abutments that are used by Kingston Railway Bridge. The existing footbridge currently bears on to the existing Network Rail abutments. It has been shown through a load assessment that the proposed bridge is to impose a lower load on the existing Network Rail abutments, for the following load cases…

Read all of it on Contracts Finder →

Details

What the buyer calls it
Kingston Station Replacement Cycle/Foot Bridge
How they are buying
Advertised, open to anyoneAny supplier could bid without being invited first.
Type
works
Work starts
30 Jun 2018
Work ends
31 Jan 2019

Who the buyer named

The buyer published a contact address on this notice.

Commissioning@kingston.gov.uk