Skip to the main content
The Crier

L16141-T-RC High Voltage Maintenance and Installation for Airport

Your saved contracts

What the buyer wrote

LLAOL is seeking a partnership with a HV supplier who will manage the Operation and Maintenance of its existing HV network for a 3 + 1 term. The HV network consists of 27 substations and estimated 8km of new and old cabling. The works package may also from time to time include asset replacement, cable replacement and construction of new substations primarily driven by 3rd parties. As LLAOL is Operational 24x7 all switching will be carried out of hours, 1800 - 0400 hours. Any switching carried out the airfield generators must be running. LLAOL operates a no power loss for all works and utilises generators to provide seamless maintenance.

Details

What the buyer calls it
L16141-T-RC High Voltage Maintenance and Installation for Airport
How they are buying
Advertised, open to anyoneAny supplier could bid without being invited first.
Type
services
Suitable for small firms
The buyer says yes. What that is worth
Work starts
30 Apr 2017
Work ends
30 Apr 2021

Who the buyer named

Terry Gittins was the named contact on this notice.

terry.gittins@ltn.aero