Skip to the main content
The Crier

L18022-T-JC Replacement of LTHW valves within the New Terminal Building Boiler House

Your saved contracts

What the buyer wrote

This project has 2 elements:- 1) Replacement of 24, large diameter (150 to 250mm Diameter), low temperature hot water isolation valves which due to their age, do not effectively close and impacts TSD's ability to carry out maintenance on the boiler system. 2) installation of 2 new gas fired water boilers which will be dedicated to supply the new terminal with hot water and eliminate the need to run the current large boilers during the summer period. Additional information: Prospective contractors must be able to demonstrate previous experience of similar work and be prepared to provide references. Applications are welcome from single organisations or consortia from the …

Read all of it on Contracts Finder →

Details

What the buyer calls it
L18022-T-JC Replacement of LTHW valves within the New Terminal Building Boiler House
How they are buying
Advertised, open to anyoneAny supplier could bid without being invited first.
Type
works
Work starts
3 Jun 2018
Work ends
3 Jun 2019

Who the buyer named

Michaela Caulfield was the named contact on this notice.

Michaela.Caulfield@ltn.aero