L24121-T-MC - Design and Build - Refurbishment of Hangars 9 60 and 127
What the buyer wrote
LLA require a Design and build contractor to refurbish Hangars 9 60 and 127. Following Monarch Aircraft Engineering Limited - MAEL- entering into administration, LLA agreed the transfer and agreement for sale to take back possession of Hangar 9 Hangar 60 and Hangar 127 in Feb-2024. It is intended to re-lease H60 and H127 to airlines operating at the airport to use as Maintenance Repair and Operation Centres -MRO. The works are for the complete refurbishment of all three Hangars H9 H60 and H127 to create two fully operational maintenance hangars and a Consolidation Centre. Note the works to the maintenance hangars will include both CAT A and CAT B works. The proposed works to Hangar 9 will o…
Details
- What the buyer calls it
- L24121-T-MC - Design and Build - Refurbishment of Hangars 9 60 and 127
- How they are buying
- Advertised, then negotiatedThe buyer talked terms with bidders rather than taking fixed offers.
- Type
- works
- Where
- in the East of England
Who the buyer named
Tanja Scheider was the named contact on this notice.
