Level 4 Zone 4CS, 4CE, 4BW 1. Survey of existing installation 2. All works associated with the safe decommissioning and removal of the existing redundant lighting installation 3. All works associated with the modifications to the existing lighting circuitry including containment and energy meters 4. All works associated with the supply and installation of new general and emergency luminaires 5. All works associated with the supply and installation of the new lighting controls equipment 6. All works associated with the testing commissioning and demonstration of the new lighting installation 7. All works associated with the post installation evaluation 8. All builders’ works in connect…
Bid for this and lost? There is a short window in which the decision can be questioned.
Awarded to
Details
- What the buyer calls it
- Laboratory Lighting Refurbishment
- How they are buying
- The buyer did not say
- Suitable for small firms
- The buyer says yes. What that is worth
- Work starts
- 31 May 2015
- Work ends
- 31 Jul 2015
Who the buyer named
Mercy J Mashem was the named contact on this notice.