Laboratory Medicine Building Queen Elizabeth University Hospital Campus Obsolete BEMS Replacement – Phase 2
What the buyer wrote
NHS GG&C require the Building Energy Management System (BEMS) at Laboratory Medicine Building Queen Elizabeth University Hospital Campus to be upgraded to meet the criteria detailed with the BRE Energy Management and Building Controls briefing paper. This means that a full ’turnkey’ project encompassing a fully designed, supplied, installed and commissioning of the project is needing to be delivered. The project will upgrade the existing control installation including the design of revised control strategies, supply and installation of new controls panels along with all required sensors, hardware & software to allow the BEMS to be a managed protocol, remotely accessible system which meets th…
Bid for this and lost? There is a short window in which the decision can be questioned.
Details
- What the buyer calls it
- Laboratory Medicine Building Queen Elizabeth University Hospital Campus Obsolete BEMS Replacement – Phase 2
- How they are buying
- Given to one supplier, no competitionNobody else was asked, and the buyer has to be able to justify that.
- Type
- services
- Where
- in Scotland
- Kind of work
- Renewables and building decarbonisation
Who the buyer named
The buyer published a contact address on this notice.
