What the buyer wrote
The purpose of this commission is for the Contractor to undertake a feasibility study and cost analysis including anticipated return on investment providing a detailed report focusing on: • The reuse of tunnel sump water for tunnel wall washing. • The reuse of building roof and waste water for flushing building toilets and use in sinks and showers. The Contractor shall undertake the feasibility study following RIBA stages: • RIBA stage 0 - Strategic Definition. • RIBA stage 1 - Preparation and Briefing. • RIBA stage 2 - Concept Design. The feasibility study shall consider the reuse and filtration of sump water to current safe water quality standards considering the production requirements of…
Bid for this and lost? There is a short window in which the decision can be questioned.
Awarded to
Details
- What the buyer calls it
- LCRCA Consultancy Agreement - Water & Filtration
- How they are buying
- Quotes from a few suppliersThe buyer approached a small number directly rather than advertising it.
- Where
- in the North West
Who the buyer named
Procurement Team was the named contact on this notice.
