What the buyer wrote
Additional lead works to turret, including the necessary timber repair Remove flaking paint from leadwork to the top two levels of the 28-square-metre turret Triflex Pro Tect is installed on the remaining lead work to the top two levels (35m²) Install Triflex Pro Tect on the two remaining lead flat roofs Ensure that stone repairs are carried out and that the crest is painted on the front of the building
Bid for this and lost? There is a short window in which the decision can be questioned.
Awarded to
Details
- What the buyer calls it
- Lead Work
- How they are buying
- The buyer did not say
- Where
- in London
Who the buyer named
Ben Higgs was the named contact on this notice.
