Skip to the main content
The Crier

Leigh-on-Sea Community Centre - Supply and Install New Lift

Your saved contracts

What the buyer wrote

Leigh-on-Sea Community Centre's current platform lift cannot manage heavy use. We are looking for a new hydraulic lift for heavy use. The quote should include the cost to remove and dispose of the existing platform lift and supply and install a self-supporting structure. Quotations should be based on the following guidance of what is required: Main Supply 250Vac 1 Phase, Capacity: approx. 400 KG load, Travel: 5680mm, Pit Depth: 100mm, Headroom: 2600mm, Entrances: 2, Stops: 2, Drive Unit: Hydraulic, Control System: PLC Control board & Hydraulic power unit, Integrated inside a small cabinet, Material: Stainless Steel, Doors: Fully Automatic Sliding, Guide Rails: T-RH Mount…

Read all of it on Contracts Finder →

Bid for this and lost? There is a short window in which the decision can be questioned.

Awarded to

Quantum Services£31.9kends (23 Jan 2019)

Details

What the buyer calls it
Leigh-on-Sea Community Centre - Supply and Install New Lift
How they are buying
Quotes from a few suppliersThe buyer approached a small number directly rather than advertising it.
Type
goods
Suitable for small firms
The buyer says yes. What that is worth
Work starts
3 Jun 2018
Work ends
23 Jan 2019

Who the buyer named

Zacharia Milner was the named contact on this notice.

zmilner@johnsongillies.co.uk