ON-HOLD: LEM005d ITT for a battery energy storage system (BESS) providing both UPS capability and grid ancillary services for a commercial site in mid Cornwall
What the buyer wrote
THIS PROCUREMENT EVENT IS ON HOLD UNTIL FURTHER NOTICE. This project is part of the wider Cornwall Local Energy Market Programme in Cornwall. The scope of this Invitation to Tender (ITT) is to procure a BESS to provide both Uninterruptible Power Supply (UPS) capability and selected grid services, which will be located Behind The Meter (BTM) at a Commercial site in mid Cornwall. The scope includes the design of the BESS; execution of transport, offloading, installation, commissioning, testing and sign off/certification, in addition to providing an operation and maintenance service. System sizes could range from: 150kW x 75kWh to 250kW x 125kWh. Centrica plc's Cornwall Local Energy M…
Details
- What the buyer calls it
- ON-HOLD: LEM005d ITT for a battery energy storage system (BESS) providing both UPS capability and grid ancillary services for a commercial site in mid Cornwall
- How they are buying
- Advertised, open to anyoneAny supplier could bid without being invited first.
- Type
- goods
- Suitable for small firms
- The buyer says yes. What that is worth
- Work starts
- 17 Jan 2020
- Work ends
- 31 Dec 2020
Who the buyer named
Register for a ITT pack via the Cornwall LEM email address was the named contact on this notice.
