Skip to the main content
The Crier

Library Building, Primary System Replacement Project

Your saved contracts

What the buyer wrote

Goldsmiths University of London is based in New Cross in South East London and is home to the library building, also called the Rutherford Building. This is one of the main buildings of the campus with library facilities in operation 24 hours a day 7 days a week. The time allocated for this plant room strip out and installation is at a time that the library is in usage therefore a duty of care to noise is to be taken very seriously. The College is inviting contractors to bid for the M&E Refurbishment of the primary LTHW system and HWS located in the plant room on the top floor of the Library. The full strip out of the library primary side is required with some equipment to b…

Read all of it on Contracts Finder →

Details

What the buyer calls it
Library Building, Primary System Replacement Project
How they are buying
Advertised, open to anyoneAny supplier could bid without being invited first.
Type
works
Work starts
15 Jul 2018
Work ends
17 Aug 2018

Who the buyer named

Rosie Hale was the named contact on this notice.

Rosie.hale@uwe.ac.uk