Skip to the main content
The Crier

Lift Refurbishment Works At David Murray John (DMJ) Building

Your saved contracts

What the buyer wrote

Project Description This project involves a variety of Mechanical/Electrical works associated with the refurbishment of the lift at the David Murray John Building Swindon. This includes, but is not limited to: • Supply and fit new intelligent duplex control panels and VVF frequency drive units to both lifts to replace the existing obsolete units. • Carry out a full rewire of the lift car and lift shat switches using advanced signal Can Bus wiring. • Supply and fit new digital load weighing devices. • Supply and fit new absolute floor position encoder systems. • Supply and fit new 4.3"TFT floor position indicators to each floor. • Supply and fit new Landing push stations inclusive of …

Read all of it on Contracts Finder →

Details

What the buyer calls it
Lift Refurbishment Works At David Murray John (DMJ) Building
How they are buying
Advertised, open to anyoneAny supplier could bid without being invited first.
Type
works
Suitable for small firms
The buyer says yes. What that is worth
Work starts
11 Jul 2019
Work ends
20 Sep 2019

Who the buyer named

Gerry Prodöhl was the named contact on this notice.

GProdohl@swindon.gov.uk