LINC 144 - Steel Fibre Reinforced Concrete Technology Development
What the buyer wrote
Sellafield has a requirement to design and manufacture waste containers that are cost effective with respect to material, manufacturability, and infrastructure (throughput driven). These waste containers (WC) will be primarily used the for long-term storage of solid Low-Level Waste (LLW) which are intended to be temporarily stored in CHILW (interim storage facility) and subsequently in a Geological Disposal Facility (GDF). Steel Fibre Reinforced Concrete (SFRC) material is identified as a potential solution for a cost-effective waste container solution. Therefore, under the governance of the Manufactured Product Organisation (MPO), the Civil Structural & Architectural (CS&A) capability is ca…
Bid for this and lost? There is a short window in which the decision can be questioned.
Awarded to
Details
- What the buyer calls it
- LINC 144 - Steel Fibre Reinforced Concrete Technology Development
- How they are buying
- Quotes from a few suppliersThe buyer approached a small number directly rather than advertising it.
- Where
- in the North West
Who the buyer named
Gemma Cardilli was the named contact on this notice.
