What the buyer wrote
The project comprises the removal of glazing from the original/ historic stone window frames. The stone windows are to remain unaltered and replacement double glazed units are to be installed within the original apertures in the stonework. Also included within the scheme are four additional windows to be replaced within brickwork and timber surrounds. Roofs to both teaching blocks require repairs to slate areas and lead sheet detailing. An existing external door also requires timber repairs. The Principal Contractor will be expected to organise/ facilitate a detailed survey by the window installer ahead of the Construction Phase.
Bid for this and lost? There is a short window in which the decision can be questioned.
Awarded to
Details
- What the buyer calls it
- Lincoln St Peter in Eastgate Infants School Windows and Roof repairs
- How they are buying
- Advertised, shortlist firstSuppliers applied to be considered, and the buyer picked who went on to bid.
- Type
- works
- Suitable for small firms
- The buyer says yes. What that is worth
- Work starts
- 18 Feb 2019
- Work ends
- 28 Aug 2020
- Kind of work
- Construction
Who the buyer named
Ms Helen Charity was the named contact on this notice.