Skip to the main content
The Crier

Linslade Recreation Ground Play Area Refurbishment

Your saved contracts

What the buyer wrote

Works required; Removal of existing multiplay unit, double seesaw, litter bins and existing gate to be removed and reinstated with the new gate as supplied by us. Suitable new train-themed multiplay unit. Suitable new accessible roundabout Suitable new car-themed springer Suitable goal end excluding basket ball hoop. Suitable educational play panel New surfacing of wetpour upto 6 locations including repairs to shrinkage and coloured wetpour graphics. New pathway - Construct new path with timber edge at a width of 2m and lenght of up to 15.3m Post Installation Inspection Report from RoSPA Costs to include all carriage, prelims, site set-up mobilisation etc.

Bid for this and lost? There is a short window in which the decision can be questioned.

Awarded to

Peak Scientific Instruments Limited£44kends (31 May 2018)

Details

What the buyer calls it
Linslade Recreation Ground Play Area Refurbishment
How they are buying
Advertised, shortlist firstSuppliers applied to be considered, and the buyer picked who went on to bid.
Type
goods
Suitable for small firms
The buyer says yes. What that is worth
Work starts
1 Mar 2018
Work ends
31 May 2018

Who the buyer named

Mark Saccoccio was the named contact on this notice.

mark.saccoccio@leightonlinslade-tc.gov.uk