Load matching system integration with building management system
Aston Universitygoods
What the buyer wrote
To improve the capability of the EBRI energy system the existing load matching system (LMS) EBRI wishes to include information from the BMS into the LMS system. We require a list of 26 data points to be taken from the BMS and sent into the LMS. These data points need to be integrated into the existing LMS that consists of a Siemens S7 PLC with SCADA interface. The signal will arrive in Modbus form to the LMS from the BMS. We require these to be programmed such that they are available in the SCADA and PLC for later computation. Additional information: PLEASE SEE THE WEBSITE UNDER THE CONTACT DETAILS TO BE ABLE TO VIEW THE QUOTE SPECIFICATION.
Details
- What the buyer calls it
- Load matching system integration with building management system
- How they are buying
- Advertised, open to anyoneAny supplier could bid without being invited first.
- Type
- goods
- Suitable for small firms
- The buyer says yes. What that is worth
- Work starts
- 16 Mar 2015
- Work ends
- 15 Jun 2015
Who the buyer named
Jason Goodwin was the named contact on this notice.
