What the buyer wrote
The current London Bridge was designed by Mott, Hay and Anderson. The senior engineer was Alan Simpson, the superstructure was designed by a team led by Michael Leeming, and foundations by a team led by Keith Ponting. The bridge was constructed by contractors John Mowlem and Company from 1967 to 1972, and opened by Queen Elizabeth II on 17 March 1973. It comprises three spans of pre-stressed concrete box girders, at a total of 928 feet (283 m) long. On the upstream and downstream sides of the bridge a track has been provided, below the parapet, to serve the under bridge lighting. The track installation comprises an aluminium “I” beam secured to the underside of the bridge parapet. At t…
Details
- What the buyer calls it
- London Bridge Tracks - Surveying and testing
- How they are buying
- The buyer did not say
- Type
- services
- Suitable for small firms
- The buyer says yes. What that is worth
- Work starts
- 3 Oct 2015
- Work ends
- 8 Nov 2015
Who the buyer named
Michael Harrington was the named contact on this notice.
