Skip to the main content
The Crier

London Construction Programme (LCP) Works Contractor Framework 2018

Your saved contracts

What the buyer wrote

Text to be corrected in the original notice: Place of text to be modified: II.2.4 Instead of: The lot category will cover Education and Leisure projects in the following sub categories: £1-£5m GBP (split into central, north, east, south and west London), £5-£10m GBP (pan London) £10-£20m GBP (pan London) and over £20m GBP (pan London). The works and services will comprise of all types of building construction works and associated mechanical, electrical and services works and may include design and other services as required for a develop and construct/refurbishment /turnkey or design and build works project. Read: The lot category will cover Housing and Residential…

Read all of it on Contracts Finder →

Details

What the buyer calls it
London Construction Programme (LCP) Works Contractor Framework 2018
How they are buying
The buyer did not say
Type
works
Suitable for small firms
The buyer says yes. What that is worth
Work starts
19 May 2019
Work ends
20 May 2026

Who the buyer named

Marianne Ecker was the named contact on this notice.

marianne.ecker@haringey.gov.uk