The Carus Green project works involve construction of new surface water drainage that will be able to collect and convey surface runoff towards the River Kent.\r Stage 1 for Design only Awarded 6/10/2020
Bid for this and lost? There is a short window in which the decision can be questioned.
Awarded to
Details
- What the buyer calls it
- Lot 2B - Carus Green Design & Build (Stage 1 Design ONLY)
- How they are buying
- The buyer did not say
- Type
- works
- Suitable for small firms
- The buyer says yes. What that is worth
- Work starts
- 11 Oct 2020
- Work ends
- 30 Apr 2021