Lot 2B - Carus Green Design & Build (Stage 1 Design ONLY)

Your saved contracts

What the buyer wrote

The Carus Green project works involve construction of new surface water drainage that will be able to collect and convey surface runoff towards the River Kent.\r Stage 1 for Design only Awarded 6/10/2020

Bid for this and lost? There is a short window in which the decision can be questioned.

Awarded to

Cubby Construction Ltd£5.4kends (30 Apr 2021)

Details

What the buyer calls it
Lot 2B - Carus Green Design & Build (Stage 1 Design ONLY)
How they are buying
The buyer did not say
Type
works
Suitable for small firms
The buyer says yes. What that is worth
Work starts
11 Oct 2020
Work ends
30 Apr 2021