What the buyer wrote
A single story SIPS (Thermal Insulated Building) with a natural clad stone façade and a low level split roof. Piling with a pad foundation. Partial removal of a 1.9 meter wall that bounds the greenway for access to the library. Modification to the pavement and roadway to site.
Bid for this and lost? There is a short window in which the decision can be questioned.
Awarded to
Details
- What the buyer calls it
- LR200159 - Birkby Fartown Library - New Build
- How they are buying
- Advertised, shortlist firstSuppliers applied to be considered, and the buyer picked who went on to bid.
- Type
- works
- Work starts
- 9 Nov 2020
- Work ends
- 23 Apr 2021
- Kind of work
- New build construction, Civil engineering and groundworks
Who the buyer named
Mick Farmer was the named contact on this notice.
