What the buyer wrote

The Strathy Wood Windfarm Connection project proposes the establishment of a 132/33kV substation to allow the connection of the Strathy Wood windfarm on the network. The proposed substation is to have a single 132/33kV 90 MVA transformer (GT1) bay established at the windfarm with associated switchgears. The Strathy South project proposes the establishment of a 132/33kV substation to allow the connection of the Strathy South windfarm on the network. The proposed substation is to have a two 132/33kV 120 MVA transformer (GT1 & GT2) bays established at the windfarm with associated switchgears.

Bid for this and lost? There is a short window in which the decision can be questioned.

Awarded to

Supplier not named

Details

What the buyer calls it
LT107/108 Strathy Wood & LT229/230 Strathy South Grid Transformer
How they are buying
Advertised, then negotiatedThe buyer talked terms with bidders rather than taking fixed offers.
Type
works
Where
in Scotland

Who the buyer named

James Knight was the named contact on this notice.