What the buyer wrote
The design, supply, installation of a Physical Prevention of Over-speeding System to the London Trams numbering 35 trams. The system to be supplied must bring the trams to a full service brake stop and have a minimum Safety Integrity Level (SIL) of 2. The system is being installed to prevent trams from over-speeding in high risk locations on the tram infrastructure.
Details
- What the buyer calls it
- LTC17466 Physical Prevention of Overspeeding System
- How they are buying
- Advertised, shortlist firstSuppliers applied to be considered, and the buyer picked who went on to bid.
- Type
- services
- Suitable for small firms
- The buyer says yes. What that is worth
- Work starts
- 21 Oct 2018
- Work ends
- 21 Oct 2023
- Kind of work
- Transport and fleet
Who the buyer named
Mr Stephen Corboy was the named contact on this notice.