What the buyer wrote
Construction of piled foundations to extend the footprint of the existing Harboumaster's office, which borders a Conservation Area, to provide a ground floor single storey extension. Also, construction of a second floor to the existing office as well as a connecting walkway to the neighbouring RNLI building. Please use the link below to access the advert on the Suppling the South West portal https://procontract.due-north.com/Advert?advertId=fb33e8cd-6a41-e811-80eb-005056b64545&p=696a9836-1895-e511-8105-000c29c9ba21
Bid for this and lost? There is a short window in which the decision can be questioned.
Awarded to
Details
- What the buyer calls it
- Lyme Regis Harbourmaster's Office extension
- How they are buying
- Advertised, open to anyoneAny supplier could bid without being invited first.
- Type
- works
- Suitable for small firms
- The buyer says yes. What that is worth
- Work starts
- 2 Sep 2018
- Work ends
- 16 Mar 2019
Who the buyer named
Anne Goldsmith was the named contact on this notice.
