Skip to the main content
The Crier

Lynemouth - Design, Manufacture and Installation of Lagoon Baffles

Your saved contracts

What the buyer wrote

The Employer requires a pair of bespoke baffles to be designed, manufactured and installed in a lagoon located at Lynemouth Mine Water Treatment Scheme. The Lynemouth Phase I mine water treatment scheme (MWTS) is located on the Northumberland coast on the site of the former Ellington Colliery. Coal mine water is abstracted at a rate of circa. 115 L/s from an abandoned mine shaft, treated through two lagoons configured in series before being discharged into the sea. The lagoons are constructed in colliery spoil and lined with an HDPE liner. The treatment process is designed to reduce total iron in the effluent which presents as ochre sludge in the lagoons; the mine water is cur…

Read all of it on Contracts Finder →

Bid for this and lost? There is a short window in which the decision can be questioned.

Awarded to

John F Hunt Regeneration Limited£47.3kends (31 Mar 2020)

Details

What the buyer calls it
Lynemouth - Design, Manufacture and Installation of Lagoon Baffles
How they are buying
Advertised, open to anyoneAny supplier could bid without being invited first.
Type
services
Suitable for small firms
The buyer says yes. What that is worth
Work starts
29 Sep 2019
Work ends
31 Mar 2020

Who the buyer named

Helen Baldwin was the named contact on this notice.

helenbaldwin@coal.gov.uk