Main Rehab Framework Build Only
What the buyer wrote
This programme of the works includes, but is not limited to the following packages of work: Renewal of the water mains network shall include but not be limited to: · Optimisation, structural replacement or relining of distribution water mains within DMAs and bounded by district meters and the District Boundary Valves. · Structural replacement of all service connections from the distribution mains to customer boundaries, including installation of a suitable boundary box. · Replacement of all apparatus connected to the network including valves, hydrants, disinfection points, air valves, etc. · Securing abandoned mains by cutting and capping. Removing surface covers, marker posts and plates …
Details
- What the buyer calls it
- Main Rehab Framework Build Only
- How they are buying
- Advertised, then negotiatedThe buyer talked terms with bidders rather than taking fixed offers.
- Type
- works
- Framework
- Yes: joining it lets you bid for call-offs without a new tender each time
- Where
- in London, in the South East
Asking a question
Thames Water is the named contact on this notice. Questions closed on 8 Sep 2025, 17:00 BST.
procurement.support.centre@thameswater.co.uk
Above threshold you will be asked for a PPON and a share code when you bid. Getting one takes about half an hour, once.
