Manchester Airport Group Vertical Transportation Framework
What the buyer wrote
MAG Framework – New install / Refurbishment The provision of the MAG Framework is indicative and based on future requirements of all three MAG UK Airport locations which will include, New install / Refurbishment Specification for a minimum period of 3 years. The New install / Refurbishment work will be carried out in line with the capital expenditure Programme. The scope of these works includes but is not limited to design, supply, install, test, commissioning of new elevators, escalators and auto walkways as well as decommissioning identified Elevators and Escalators. All works where possible will be carried out using Modern Methods of Construction (MMC) and Design for Manufacture & Assemb…
Details
- What the buyer calls it
- Manchester Airport Group Vertical Transportation Framework
- How they are buying
- Advertised, then negotiatedThe buyer talked terms with bidders rather than taking fixed offers.
- Type
- works
- Framework
- Yes: joining it lets you bid for call-offs without a new tender each time
Who the buyer named
Andy Hayes was the named contact on this notice.
