Manufacturability Assessment of the PEGASUS Transport Package Design
What the buyer wrote
The NTS objectives for the manufacturability assessment are: a) Undertake an assessment of the design and make recommendations for change, where necessary, to improve manufacturability and the ability to inspect b) Confirm the optimum method of manufacture of the PEGASUS key components with a focus on fleet manufacture c) Identify any differences in strategy based on fleet size i.e. if there are any fleet sizes (10, 100, 1000) that would bring in different processes, such as automation. d) Develop a cost estimated programme of delivery for production of a fleet of PEGASUS packages
Bid for this and lost? There is a short window in which the decision can be questioned.
Awarded to
Details
- What the buyer calls it
- Manufacturability Assessment of the PEGASUS Transport Package Design
- How they are buying
- Advertised, open to anyoneAny supplier could bid without being invited first.
- Type
- services
- Work starts
- 15 Dec 2025
- Work ends
- 26 Mar 2026
- Where
- in the North West
- Kind of work
- Architecture, engineering and surveying
Who the buyer named
Ann McGuinness was the named contact on this notice. Questions closed on 20 Nov 2025, 15:00 GMT.
