Skip to the main content
The Crier

Manufacture and Installation of a Lifting Bridge at Lodgemore Lane, Stroud

Your saved contracts

What the buyer wrote

Suppliers must have previous experience of manufacture and installation of bridges. Lodgemore Lane Lifting Bridge is to be located on the site of an existing fixed bridge which once formed a swing bridge built in the 1940`s to replace an earlier swing bridge. The bridge is a mixed usage bridge which also acts as one of two primary routes across a presently unrestored section of the Stroudwater canal to the WSP Lodgemore Textile Mill. The existing fixed bridge is to be demolished and replaced by a manually operated overhead counterweight lifting bridge. The scope of the Contract is for the <i>Contractor</i> to act as <i>Principle Contractor</i> under CDM and undertake the detail design,…

Read all of it on Contracts Finder →

Details

What the buyer calls it
Manufacture and Installation of a Lifting Bridge at Lodgemore Lane, Stroud
How they are buying
The buyer did not say
Type
works
Work starts
9 Aug 2015
Work ends
8 Feb 2016

Who the buyer named

Jo Spain was the named contact on this notice.

jo.spain@stroud.gov.uk